trussnote
Permit Review

Catch permit issues before the building department does.

TrussNote reviews your construction documents against local building codes and flags non-compliance automatically — in minutes, not weeks.

3-6 weeks

Average plan check turnaround in major cities

60%

Of first permit submissions receive correction notices

$50k+

Average cost of permit delays on a mid-size project

How it works.

1

Upload your documents

Upload your permit package — drawings, specifications, or any combination. TrussNote reads them in seconds.

2

AI reviews against code

Our AI checks your documents against applicable building codes, flags non-compliance, and notes missing items.

3

Get a prioritized report

Receive a structured report with issues ranked by severity, code citations, and suggested resolutions.

What TrussNote checks.

A comprehensive pre-submission review across the most common plan check failure categories.

Egress requirements and exit widths
Occupancy classification and construction type
Fire separation distances and rated assemblies
Accessibility (ADA/CBC) compliance
Structural documentation completeness
Energy code compliance documentation
Mechanical, electrical, and plumbing coordination
Plan consistency across sheets

Stop getting correction notices.

Run your next permit package through TrussNote before submission. Free trial, no credit card required.

Start free trial